PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Bolting Derrick -1 Facing South (800x600).jpg Continued backfilling and compacting inside Stair -2 Facing West (800x600).jpg Installing Steel deck angle at Elev. 1,2,3 (3rd Floor) Facing North-East (800x600).jpg Installing the steel deck angles at Elev. 1,2,3 (3rd Floor) Facing South-East (800x600).jpg Securing the Shear wall panels at Elev. 7-Stair -4,5, Facing South-West (800x600).jpg Welded Column at Derrick -1 Facing East (800x600).jpg Welded Column at Derrick -1 Facing South(800x600).jpg Welding columns at Derrick -1 Facing East (800x600).jpg Welding the Columns at Derrick -1 Facing South-West (800x600).jpg
Previous pageNext page Securing the Shear wall panels at Elev. 7-Stair -4,5, Facing South-West (800x600)
Securing the Shear wall panels at Elev. 7-Stair -4,5, Facing South-West (800x600)